CASE STUDY
In the spring of 2023, Brighton and Hove Council sought to conduct a ground investigation to improve the coastal defences and protect them from flooding and erosion. Primely Ltd provided UXO Support for this critical project.
During the ground investigation for the expansion and maintenance of the Eurotunnel in Folkstone, the client sought a blend of expertise and cost efficiency. We collaborated closely with the client to deliver a solution that was both economical and effective. The client was pleased with our approach and the outcomes we achieved.
During the drilling of boreholes to consolidate various shafts of a major UK project, the drillers lost several metres of drilling casings within several different boreholes. We stepped in and using state-of-the-art technology, were able locate the missing casings 100m beneath the ground.
During our support during a major
project in Kent, a "Spitfire propeller"
was found, prompting archaelogical work. We had to step in at a very short notice to provide expertise and assess the risk of unexploded bombs on the latter site.
During ground investigations at a major train station in Bristol, the client required a 24hr/day UXO watch over a long period of time. Primely provided UXO specialists on rotation and was able to see the project through.
For this project, the challenge was to provide UXO support at an educational establishment on behalf of the Ministry of Education at very short notice. We met and exceeded expectations with outstanding results.
Here, competent specialists with the right level of security clearance was deployed to conduct the work quickly and safely. The results were 'outstanding', according to the client.
Southwark Council commissioned Primely Ltd regarding Wickway Community Centre in London to conduct a detailed UXO Risk Assessment at an affordable cost to the general public. The study was done relatively quickly and under budget.